| Article ID: | iaor19932262 |
| Country: | Switzerland |
| Volume: | 41 |
| Issue: | 1/4 |
| Start Page Number: | 185 |
| End Page Number: | 206 |
| Publication Date: | May 1993 |
| Journal: | Annals of Operations Research |
| Authors: | Charest Michle |
| Keywords: | maintenance, repair & replacement |
The problem of preventive maintenance planning of electric power generating units can be formulated as a mixed-integer linear optimization problem. An extension of the model is presented to deal with more realistic assumptions about utilization of power resource. The authors propose a heuristic iterative exchange procedure to solve these problems. They introduce two methods to prevent jamming situations outside the feasible domain or at a local optimum. The first method is a recursive exchange procedure called multiple exchanges method and the second relies on Lagrangian relaxation. Furthermore, the authors compare these procedures with a tabu search.