| Article ID: | iaor19881265 |
| Country: | India |
| Volume: | 5 |
| Issue: | 1 |
| Start Page Number: | 37 |
| End Page Number: | 41 |
| Publication Date: | Apr 1989 |
| Journal: | International Journal of Management and Systems |
| Authors: | Gopalan M.M., Ramesh T.K. |
| Keywords: | production |
This paper deals with the cost-benefit analysis of a system with two production stations connected in series. A buffer of finite capacity is provided in between the stations. The input to station 1 follows a Poisson process. The output of station 1 forms the input to station 2. The service time distribution of station 1 is arbitrary whereas that of station 2 follows exponential law. Explicit expressions for (1) the expected busy periods of the two stations in [0,